![]() |
pittman 12 new panels installed: 07.06.11 |
![]() ![]() ![]() ![]() transom mud. ![]() ![]() mud happens. ![]() six panels on the mud table. ![]() pre-mud bevel cluster detail. ![]() transom assembled and side one is soldered. ![]() encasing the cluster with background glass and border bevels. ![]() transom cluster completed. ![]() starting bevel cluster. ![]() transom glass cut, ready to assemble. ![]() finished smaller panel (1-6) for install along doors. |
previous installation in front of house.
![]() |
|
site index • your feedback would be appreciated. |